Kan English
Police say it will be weeks before Golan wind turbine work can resume
- Autor: Vários
- Narrador: Vários
- Editor: Podcast
- Duración: 0:08:56
- Mas informaciones
Informações:
Sinopsis
Police sources say construction of wind turbines on the Golan Heights is unlikely to resume in the coming weeks. There were large protests by Druze in June that led to a temporary halt in construction and police say it will take weeks to deploy forces ahead of for the renewed construction. Since the freeze, negotiations have taken place between Druze leaders and the Prime Minister’s Office, but without a breakthrough. KAN's Mark Weiss spoke with Dr Amir Khnifess, Chair of the Israel Druze Center, and asked him why the Druze residents on the Golan Heights are opposed to the construction of the wind turbines. (Photo:Flash90)See omnystudio.com/listener for privacy information.